Documentație / Limbi Străine / Facultate
At this method the points of principal axes of the structures are set out and marked by nails, on the batter board and the project points are transferred on the ground by the plumb lines, suspended at places of wire intersection. Accuracy. If the points being set out are specified with... citeste mai departe