In figure 1 we considered a power system consists of::
- a power plat equipped with two generator-transformer block groups of 50 MW, with the parameters in Tables 1 and 2;
- a 110 kV grid, consisting of three overhead power lines, , which is design to consume energy from the central and to supply electricity to the power consumption area, with the parameters presented in Table 3;
- transformer substation of 110 kV / 20 kV equipped with two 63 MVA transformers ;
Fig. 1. Single line power system diagram.
For a given power system treat the following aspectes:
- Operating system analysis;
- The study of voltage stability;
- Simulation of the schematic using the NEPLAN software.
We will consider the following system operating conditions:
- T1 and T2 transformers of the CET are working on the nominal plot, and T3 , T4 transformers from the drop-down station are working on plot -5;
- automatic voltage regulators of generators from CET, controls the node voltage CET-IT;
- nodal quantities values - voltage, active power, reactive power - are reported to the basic voltage , respectively the basic power ;
- L2 line is withdrawn from service for repairs.
Tabel 1. Electrical generators parameters
Gen SN
[MVA] PN
[MW] UN
[kV] cos? Xd, Xq
[%] Xd', Xq'
[%] T0'
[s] Tq'
[s] H
[s]
G1, G2 62.5 50 10.5 0.8 220 20 6 0.4 6.4
Tabel 2. Transformers parameters:
Trafo Pn [MVA] Umt [kV] Uit [kV] Usc [%] ?P0=?PFe [kW] ?Psc=?PCu [kW] Reglaj IT [%] I0
[%] plot
T1, T2 80 11 121 11.5 81 351 ?9x1.78 0.4 0
T3, T4 63 22 121 12 60 260 ?9x1.78 0.9 -5
Pentru a descărca acest document,
trebuie să te autentifici in contul tău.