Example: Determination of loads on a building
envelope
This worked example explains the procedure of determination of loads on a
portal frame building. Two types of actions are considered: wind actions
and snow actions.
30,00
5,988
?
[m]
7,20
7,30
72,00
Basic data
o Total length : b = 72,00 m
o Spacing: s = 7,20 m
o Bay width : d = 30,00 m
o Height (max): h = 7,30 m
o Roof slope: ? = 5,0?
Height above ground:
h = 7,30 m
? = 5?
leads to:
h? = 7,30 - 15 tan 5? = 5,988 m
1 Wind loads
Basic values
Determination of basic wind velocity:
vb = cdir x cseason x vb,0
Where: vb basic wind velocity
cdir directional factor
cseason seasonal factor
vb,0 fundamental value of the basic wind velocity
EN 1991-1-4
? 4.2
Fundamental value of the basic wind velocity (see European windmap):
vb,0 = 26 m/s (for Aachen - Germany)
Terrain category II => z0 = 0,05 m
z > zmin
=> vb = cdir x cseason x vb,0 = 26 m/s
For simplification the directional factor cdir and the seasonal factor cseason are
in general equal to 1,0.
EN 1991-1-4
? 4.3.2
Table 4.1
Basic velocity pressure
2
b air b 2
q = 1 x ? x v
where: 1,25 air ? = kg/m? (air density)
=> 1,25 26 422,5
2
1 2
b q = x x = N/m?
EN 1991-1-4
? 4.5
eq. 4.10
Peak pressure
[ ] 2
p v m (z)
2
q (z) = 1+ 7l (z) x 1 x ? x v
Calculation of vm(z)
vm(z) mean wind velocity
vm(z) = cr(z) x co(z) x vb